
23 January 2015
Eastview Secondary School, Parking Lot Rehabilitation/SWM, City of Barrie
PEARSON ENGINEERING LTD. was retained for two separate projects at the Eastview Secondary School site. The first was the redesign of the parking areas and the second was to assist with the removal and re-instatement for the Existing Hydro Transformer Pad. The works included the detailed design of the site grading, site servicing, and a stormwater management analysis.
Printable Project Data Sheet