EDEV Inc. – Weston Road High Rise, Toronto
Pearson Engineering is involved in this proposed 11-storey residential building located at 1681 Weston Rd in the City of Toronto. Our work includes detailed servicing design on new service connections and quantity control storm tanks to convey drainage as part of the stormwater management design. This project will provide 59 residential units, underground parking and a retail unit located on the ground floor.
Podium Developments – 77 East Street High Rise, Oakville
Pearson Engineering has been retained by 2266 Lakeshore LP to provide engineering services from the draft plan stage through to detailed design and construction for 77 East Street high rise in Oakville. The site is currently occupied by three existing buildings. This redevelopment project includes a 15-storey residential apartment with associated parking. Currently, Pearson Engineering is working on the preparation of the Functional Servicing Report to be used in the application process to obtain the required official plan amendment and rezoning approvals required.
Democrat Homes, Forest Heights Subdivision, Horseshoe Valley
Pearson Engineering is involved with the development of the Forest Heights Subdivision in Horseshoe Valley. This subdivision proposes 80 estate lots, two stormwater management pond blocks, and roadworks. The project will be completed in two phases, with Pearson Engineering providing the phasing plans ensuring the most efficient development of the site. Tree clearing and earthworks, including a cut/fill analysis to determine earthwork volumes for the entire project, has been completed as part of Phase 1 roadworks and servicing tender.
Charter Construction – Stone Ridge Subdivision, Orillia
Pearson Engineering has been retained to provide our engineering design expertise and contract administration services within the Stone Ridge Subdivision in Orillia. The site is 99+ hectares in size and consists of 2236 units of which 767 units are single family residential lots. Our work includes the preparation of plot plans for house construction, contract administration, construction site inspection, consultation on future phasing and completion of as-built drawings.
Sean Homes – Rainwater Mid-Rise Development, Barrie
Pearson Engineering is a part of the design team for Rainwater, the latest development by Sean Homes. This development is an inclusive community of freehold, new urban townhomes and modern condos on Veterans Drive in Barrie. Rainwater is also the winner of the Green Builder of the Year – Low Rise Award.
HIP Developments – Barrie Central High Rise Redevelopment, Barrie
Pearson Engineering has been retained to be a part of this highly anticipated redevelopment of the Barrie Central lands. The nearly 3 hectare site was once home to the Barrie Central Collegiate Institute. This site is slated to be developed in two phases, with the first phase consisting of 2 high rise apartment buildings connected by a 6 story podium.
Recent Comments