    St. Marie of the Incarnation, Town of Bradford West Gwillimbury

    PEARSON ENGINEERING LTD. was retained to complete the detailed grading and stormwater management design for the 12,000 ft2 building and parking lot expansion for the St. Marie of the Incarnation School expansion. Two municipal road allowances were taken over as part of the building expansion and reconstructed to accommodate bus traffic and a kiss and ride student drop off area. Stormwater from the site is drained overland via sheet flow and ditches to the existing ditch and culvert system front the site.