Treelawn Industrial Subdivision

23 January 2015

Treelawn Industrial Subdivision, City of Barrie

PEARSON ENGINEERING LTD. was retained to provide engineering services for the Big Bay Point Village Industrial Park Development. The overall project consists of 10.1 hectares of land and includes a bisecting access road that runs through the property. The access road crosses an existing AC and DC electric rail line. The key component of the project was to address environmental and related stormwater management issues. This was required to be examined in a framework aimed to satisfy the City, the Lake Simcoe Region Conservation Authority and the Ministry of Environment. Traffic controls were reviewed with respect to both the vehicular roads and the existing rail line.

Printable Project Data Sheet