Orillia Bridge Removal
Service
- Structural Engineering
- Municipal Infrastructure
Market
- Municipal
client
- City of Orillia
Location
- Orillia, ON
Date
- Summer 2024 - Fall 2024
About this Project
PEARSON Engineering was engaged by the City of Orillia in 2024 to complete the detailed design and tender document preparation for the permanent removal of the old bridge structure at their Waste Diversion Site. The construction scope of work included the full removal of the bridge superstructure and partial removal of the abutment and pier supports. The roadway approaches and watercourse embankments were regraded and restored utilizing rip-rap protection and hydroseeding. Removal of the bridge superstructure was completed utilizing barge access to avoid impacts to the natural watercourse below.
Services performed
- Detailed design and tender preparation
- Preparation of erosion and sediment control plans
- Site grading and shoreline restoration design
- Preliminary and detailed cost estimating
- Coordination with the City through staged design
- Tender reviews
Key takeaways
- Permanent Bridge Removal
- Maintaining Water Flow and Fish Passage during Construction
- Embankment Stabilization Utilizing Rip-Rap Protection
- Mitigation Efforts to Avoid Traffic Flow Disruptions
Related Projects
In 2023, PEARSON Engineering was engaged by MECA Properties Inc. to complete a visual review and condition...
In 2023, PEARSON Engineering was engaged by Sophies Landing to complete the structural design of five...
No posts found