Bridge 28 Rehabilitation
Service
- Structural Engineering
- Municipal Infrastructure
Market
- Municipal
client
- Township of Adjala-Tosorontio
Location
- Township of Adjala-Tosorontio, ON
Date
- Summer 2024
About this Project
In 2024, PEARSON Engineering was engaged by the Township of Adjala-Tosorontio to complete the contract administration and construction inspection services for the rehabilitation of Bridge 28 located on Adjala 20 Sideroad. The scope of work for construction included deck top patching, waterproofing and paving, concrete curb reconstruction, bridge barrier replacements, concrete repairs to soffit, and installation of new guiderail systems with energy attenuating end treatments.
Services performed
- Contract Administration
- Construction Review
Key takeaways
- New Guiderails to Improve Roadway Safety
- Galvanic Anodes in Concrete Repairs
- Major Rehabilitation to Prolong Bridge Service-Life
- Full Roadway Closure with Detour Route
Related Projects
In 2023, PEARSON Engineering was engaged by MECA Properties Inc. to complete a visual review and condition...
In 2023, PEARSON Engineering was engaged by Sophies Landing to complete the structural design of five...
No posts found