Scott and Gowanlock Bridge Rehabilitations
Service
- Structural Engineering
- Municipal Infrastructure
Market
- Municipal
client
- The Town of Saugeen Shores
Location
- Town of Saugeen Shores, ON
Date
- Summer 2024 - Fall 2024
About this Project
In 2024, PEARSON Engineering was engaged by the Town of Saugeen Shores to complete the detailed design, tendering, and contract administration for the rehabilitation of the Scott Bridge on Concession Road 6 and Gowanlock Bridge on Concession Road 8. The scope of work for construction included concrete repairs, expansion joint seal replacement, rout and sealing of asphalt cracking, steel barrier recoating, guiderail post replacement and erosion stabilization on abutment embankments.
Services performed
- Construction Scope of Work Assessment
- Detailed Design of Bridge Repairs
- Contract Administration
- Contract Drawing and Tender Preparation
- Inspection
Key takeaways
- Maintenance Work to Mitigate Future Repairs
- Enhanced Access to Avoid In-Water Work
- Full Roadway Closures with Detour Routes
- SVCA Permit Approvals
Related Projects
In 2023, PEARSON Engineering was engaged by MECA Properties Inc. to complete a visual review and condition...
In 2023, PEARSON Engineering was engaged by Sophies Landing to complete the structural design of five...
No posts found