Bridge 28 Rehabilitation
Project Type: Structural
Market: Municipal
Client: Township of Adjala-Tosorontio
Date: Summer 2024
About this Project
Services Performed: Contract Administration, Construction Review
- New Guiderails to Improve Roadway Safety
- Galvanic Anodes in Concrete Repairs
- Major Rehabilitation to Prolong Bridge Service-Life
- Full Roadway Closure with Detour Route

In 2024, Pearson Engineering was engaged by the Township of Adjala-Tosorontio to complete the contract administration and construction inspection services for the rehabilitation of Bridge 28 located on Adjala 20 Sideroad. The scope of work for construction included deck top patching, waterproofing and paving, concrete curb reconstruction, bridge barrier replacements, concrete repairs to soffit, and installation of new guiderail systems with energy attenuating end treatments.
What We Do
Residential
Site plan servicing, natural hazard study, stormwater management, and environmental services
Industrial
Small-scale infill to extensive large residential subdivisions projects
Commercial
Small-scale infill to extensive large residential subdivisions projects
Institutional
Small-scale infill to extensive large residential subdivisions projects
Municipal
Primarily road and servicing reconstruction projects
Structural
Assessment and Design of Buildings and Bridges