McLean Taylor, West Grey Bridges N-055/N-056

Project Type: Bridges & Culverts
Market: Municipal
Client: West Grey
Date: Spring 2025 - Fall 2025

About this Project

Services Performed: Structural condition assessments, preparation of detailed design drawings, CHBDC-based structural load evaluations, shop drawing and construction document reviews, and part-time construction review services
  • Structural repairs to steel truss superstructure
  • Load evaluations to confirm load limit postings
  • Construction adjacent to regulatory watercourse
  • Participation in Design-Build team
In 2025, Pearson Engineering was engaged by the Municipality of West Grey to provide structural engineering services for the deck rehabilitation of two existing steel truss bridges, Bridge Structure N-056 and Bridge Structure N-055, as part of a Design-Build tender issued by the Municipality. The scope of the rehabilitations included the removal and replacement of the existing timber decks with new laminated timber deck systems. Structural steel below the deck tops were cleaned and recoated to improve long-term durability. More extensive structural repairs were completed at N-055 due to significant corrosion and deterioration at a localized bearing connection. Prior to construction, permit applications were obtained from the Saugeen Valley Conservation Authority (SVCA).

What We Do

Residential

Site plan servicing, natural hazard study, stormwater management, and environmental services

Industrial

Small-scale infill to extensive large residential subdivisions projects

Commercial

Small-scale infill to extensive large residential subdivisions projects

Institutional

Small-scale infill to extensive large residential subdivisions projects

Municipal

Primarily road and servicing reconstruction projects

Photo of Pearson Engineering yellow building icon

Structural

Assessment and Design of Buildings and Bridges