Santa’s Village Road
Project Type: Municipal
Market: Municipal Engineering
Client: District of Muskoka
Date: 2023
About this Project
Services Performed: Detailed Design, Contract Administration, Inspection
- 3220 Meters of Road Design
- Non Standard Right of Way
- Adjacent to Muskoka River
This project included the design of a non-standard right of way for 3+ kilometers of road, beginning at the Santa’s Village entrance to the west side of the Beaver Creek Bridge. The project design included reviewing as-built information from the district, topographic survey as well as giving consideration to local residences along the road.
What We Do
Residential
Site plan servicing, natural hazard study, stormwater management, and environmental services
Industrial
Small-scale infill to extensive large residential subdivisions projects
Commercial
Small-scale infill to extensive large residential subdivisions projects
Institutional
Small-scale infill to extensive large residential subdivisions projects
Municipal
Primarily road and servicing reconstruction projects
Structural
Assessment and Design of Buildings and Bridges