Scott and Gowanlock Bridge Rehabilitations

Project Type: Structural
Market: Municipal
Client: The Town of Saugeen Shores
Date: Summer/Fall 2024

About this Project

Services Performed: Construction Scope of Work Assessment, Detailed Design of Bridge Repairs, Contract Drawing and Tender Preparation, Contract Administration and Inspection
  • Maintenance Work to Mitigate Future Repairs
  • Enhanced Access to Avoid In-Water Work
  • Full Roadway Closures with Detour Routes
  • SVCA Permit Approvals
In 2024, Pearson Engineering was engaged by the Town of Saugeen Shores to complete the detailed design, tendering, and contract administration for the rehabilitation of the Scott Bridge on Concession Road 6 and Gowanlock Bridge on Concession Road 8. The scope of work for construction included concrete repairs, expansion joint seal replacement, rout and sealing of asphalt cracking, steel barrier recoating, guiderail post replacement and erosion stabilization on abutment embankments.

What We Do

Residential

Site plan servicing, natural hazard study, stormwater management, and environmental services

Industrial

Small-scale infill to extensive large residential subdivisions projects

Commercial

Small-scale infill to extensive large residential subdivisions projects

Institutional

Small-scale infill to extensive large residential subdivisions projects

Municipal

Primarily road and servicing reconstruction projects

Photo of Pearson Engineering yellow building icon

Structural

Assessment and Design of Buildings and Bridges